Geomorphic Mapping

Bear Creek Lower Meadow Restoration Design

Balance Hydrologics conducted the Bear Creek watershed assessment in 2017. A priority project identified in the assessment was restoration of the Bear Creek Lower Meadow. The creek is severely incised through one of the largest remaining meadows in the watershed with some of the largest remaining cottonwood trees. Stormwater generated from development in the [...]

Bear Creek Lower Meadow Restoration Design2020-03-28T02:43:01+00:00

Upper Penitencia Creek Mitigation and Restoration Design for BART to San Jose

Balance Hydrologics was retained to prepare a complete set of construction documents for the mitigation and restoration of Upper Penitencia Creek at the future site of the Berryessa BART station and campus. Mitigation and restoration design is needed to offset impacts related to extension of BART to San Jose. The project offers a unique [...]

Upper Penitencia Creek Mitigation and Restoration Design for BART to San Jose2019-03-15T22:47:36+00:00

Elizabethtown Meadow Trail and Drainage Restoration

In 2011, Balance Hydrologics completed a watershed assessment of the larger Martis Creek watershed which identified priority restoration and re-naturalization projects related to meadow restoration, channel stability, habitat enhancement, groundwater recharge, water quality improvements, flood control, and recreation.  Elizabethtown Meadow, a discharge-slope wetland and formerly a short-lived mining town that existing in 1863, has [...]

Elizabethtown Meadow Trail and Drainage Restoration2018-07-12T16:58:44+00:00

UC Davis Tahoe City Field Lab Stream and Wetland Restoration Design

Balance Hydrologics provided the conceptual and construction-level channel and wetland restoration designs for the UC Davis Tahoe City Field Lab Restoration Project. The field lab is a former fish hatchery in Lake Forest, California, and is surrounded by Polaris Creek and its associated wetlands, including an abandoned spring-fed hatchery pond. The riparian wetland system [...]

UC Davis Tahoe City Field Lab Stream and Wetland Restoration Design2018-07-12T16:59:44+00:00

Update of the Canyon Del Rey Master Drainage Plan, Monterey County

Balance Hydrologics was contracted through the Monterey Peninsula Water Management District to provide an update of the Canyon Del Rey Master Drainage Plan.  This study served to guide future watershed management decisions including drainage infrastructure improvements, sediment management issues, and land use planning. A characterization and evaluation of the watershed was completed to quantify [...]

Update of the Canyon Del Rey Master Drainage Plan, Monterey County2020-04-01T18:03:24+00:00